Evaluation of Ramp Meter Effectiveness for
by
Alex Drakopoulos Mery Patrabansh and Georgia Vergou |
|||
|
|||
MU ITE Chapter
| MU ITE Exec. | ITE WI | ITE.org
| Alumni page |ASCE MU chapter
|MU Civil Events-Pictures |Older MU ITE Pictures
| MU ITE Open House Nov 2002 |
|||
|
|||
|
PDF Files |
Size |
Notes:
The full report, including appendices is 3.8 MB.
Report body can be downloaded separately (0.5 MB) Appendices are 3.7 MB
|
Evaluation of Ramp Meter
Effectiveness for
Project identification number 0092-45-17 Final Report Alex Drakopoulos Mery Patrabansh
Submitted to the Wisconsin Department of Transportation January 2004 |
3.8 MB |
||
|
|
||
0.5 MB |
|||
|
|
Appendices can also be downloaded individually (see list below). |
|
|
|
Appendix Contents |
|
1.4 MB |
Inventory of Ramp Delay and Queue Length Information. |
||
2.3 MB |
|